Charter Party & Laytime Conciliation Services
Before the voyage starts, get the contract right. After the voyage ends, be ready with the claim.
A fixture can be agreed in a recap, but the Working Charter Party is where those terms have to be correctly captured. Diabos audits, drafts and reconciles the Working CP against the Recap and the Proforma, raising amendment points before signature and tracking the document through to execution. After the vessel sails, the same team turns the statement of facts and the charter party terms into a quality-checked laytime calculation, so the demurrage or despatch position is documented, supportable and ready the moment it is questioned.
What You Get
- Audited
- Against Recap & Proforma
- Amended
- Before signature
- Calculated
- Laytime, quality checked
- Archived
- Executed CP on record
- Standard CP turnaround
- 2–3 days
- Urgent requests
- 24 hrs
- Standard laytime turnaround
- 2 days
- Calculations quality checked
- 100%
Where would you like to start?
Contract accuracy before the voyage, time accuracy after it. Choose a side of the globe and we will take you straight there.
Before the voyage Charter Party Auditing and drafting the Working CP against the Recap and the Proforma, with amendment points raised before signature. Go to Charter Party →
Diagram: N · S
After the voyage Laytime & Conciliation Turning the operational record into a quality-checked laytime calculation, and standing behind the demurrage or despatch claim when it is questioned. Go to Laytime →
The Risk Is In The Detail
A fixture is agreed in a recap. The Working CP is where it has to be captured.
A Charter Party can contain hundreds of clauses, terms and commercial details. One mismatch can create expensive legal disputes and operational friction later.
Recapped terms may not be reflected correctly
The commercial terms agreed between Owner and Charterer in the recap need to appear accurately in the Working CP.
The Working CP may differ from the Proforma
Apart from agreed fixture-specific changes, the Working CP needs to remain aligned with the Proforma CP standard.
Critical commercial terms can be overlooked
Vessel details, cargo specs, laycan windows, ports, rates, payment terms, hold conditions and commissions all require precise verification.
Corrections need to happen before signing
Identifying an issue after execution is far more difficult and legally complex than correcting it before the document is signed.
Addressed with Diabos
What the review produces before the document goes to signature.
Charter Party Auditing & Drafting
One document. Checked against what was agreed.
Diabos performs a comprehensive review of the Working CP using the Recap and the Proforma CP as reference points.
Recorded fixture terms
- All terms agreed in the Recap verified into the Working CP
- Commercial intent checked against what the document actually says
Proforma comparison
- Working CP compared against the Proforma CP for structural alignment
- Fixture-specific agreed terms allowed for rather than flagged as errors
Clause-level review
- Reviewed in line-by-line detail
- Discrepancies, omissions and strikeout text errors identified
Amendment points & execution
- Clear, actionable correction points provided for the Working CP
- Broker coordination and execution tracking once the CP is confirmed
What We Check
The full commercial and operational scope of the fixture.
The Diabos review covers all essential parameters defining the fixture.
Vessel particulars & specs
Vessel description, specs, flag, age, hold cleanliness and relevant particulars.
Cargo details
Cargo type, quantity, stowage factor and specific handling requirements.
Laycan terms
Agreed laycan dates, laytime rules and cancelling provisions.
Parties involved
Full corporate legal identities of Owner, Charterer and Shipbrokers.
Ports & ranges
Delivery, loading, redelivery and discharging port ranges and terms.
Rates & demurrage
Daily hire rates and bunker terms (Time Charter), or freight rates and demurrage/despatch terms (Voyage Charter).
Payments & commission
Remittance details, payment schedule and address/broker commission percentages.
Other agreed terms
Maritime law provisions, BIMCO riders and previously agreed contractual clauses.
How We Deliver
From fixture documents to executed CP.
- 01
Receive the fixture documents
Working CP, Proforma CP and Recap, along with vessel details or bank copies, are received and checked for completeness.
- 02
Check the recap
Agreed fixture terms in the Recap are identified, extracted and verified against the Working CP.
- 03
Compare with the proforma
The remaining provisions of the Working CP are compared line by line against the Proforma CP.
- 04
Identify & communicate corrections
Any discrepancies or contradictions are documented with explicit amendment points.
- 05
Confirm for signing
When the Working CP is fully in order, brokers are formally advised to proceed with the signing process.
- 06
Track execution
Diabos follows up through execution, obtains the fully executed CP and archives it securely in company records.
- 01
Recap
Agreed terms
- 02
Proforma CP
Contractual framework
- 03
Working CP
Fixture document
- 04
Diabos review
Detailed audit & drafting
- 05
Amendments
Corrections
- 06
Executed CP
Archived record
Discrepancy Resolution Protocol
Find it. Fix it. Before it is signed.
When discrepancies are identified, Diabos provides specific points for correction derived directly from three reference layers.
The three reference layers
Every amendment point traces to one of these.
- 1. The Recap, what was agreed for the fixture.
- 2. The Proforma CP, the standard contractual framework.
- 3. The Working CP, what is actually being prepared for signature.
Why it matters
Because ‘almost correct’ is not correct enough.
- A completely transparent reference and audit trail between the agreed fixture and the document being executed.
- Charter Party auditing and drafting is a detail-driven exercise. Diabos applies a defined review process and maintains detailed records of discrepancies and completed fixtures.
- The objective is simple: catch the difference before it becomes a dispute.
Detailed Working CP drafting & line-by-line review
Recap-to-CP verification & Proforma-to-CP comparison
Clear, actionable amendment points for brokers and counterparties
Full execution follow-up and secure client/vessel file archiving
Traceable fixture records and error logging
Detailed records of discrepancies and completed fixtures
Turnaround
Standard 2–3 working days. Urgent requests delivered within 24 hours, subject to complete documentation.
Laytime & Conciliation Services
Every hour has a commercial consequence.
Laytime is determined by what the Charter Party says, what happened at the port, and how those events are treated under the agreed terms. Diabos reviews the required voyage documentation, applies the relevant laytime provisions, calculates the position, performs a quality check and delivers the final Laytime Calculation (LTC) for client review and settlement.
The required documents may vary
Dry bulk and tanker calculations require different supporting documentation. Missing information can prevent the calculation from being completed correctly.
Not every port event counts the same way
NOR acceptance, commencement, cessation and excluded periods must be assessed against the applicable Charter Party terms.
The calculation basis matters
Normal laytime, CQD, demurrage provisions and other agreed conditions can change how the time is treated.
What You Get
Collected Document set completed Applied CP terms to recorded events Quantified Demurrage or despatch position Defended Clarifications handled
What We Review
The documents tell the story. The Charter Party determines what counts.
A laytime calculation is only as reliable as the terms and documents behind it.
Dry bulk
The calculation may require:
- Recap and relevant terms
- Charter Party, main body and riders
- Fixture note, where applicable
- Notice of Readiness (NOR)
- Statement of Facts (SOF)
- Bills of Lading
- Dead freight letter, if any
- Other port documents
Tankers
The review can involve a broader operational document set, including:
- Notice of Readiness
- Vessel, terminal, surveyor and agent SOFs
- Ship/Shore Agreement
- Cargo handling and key transfer meeting records
- Ullage reports
- Cargo tank and slop tank inspection reports
- Bunker reports and hourly pumping logs
- Cargo calculations and Letters of Protest
- Bills of Lading and Cargo Manifest
- Certificate of Analysis / quality documents
- Vessel Experience Factor, where applicable
- Tank sealing certificates, where applicable
- Fixture Recap and amendments/comments, Charter Party and riders
The Laytime Checkpoints
The contractual points that determine how time is treated.
Before finalising the calculation, Diabos assesses each of these against the agreed terms.
NOR acceptance
When is the Notice of Readiness accepted under the Recap and Charter Party?
Laytime commencement
When does laytime commence under the applicable Charter Party provisions?
Laytime cessation
When does the allowed laytime period end?
Time exclusions
Which operational stoppages or periods are excluded under the Charter Party?
Calculation basis
Is the calculation based on Normal Laytime or CQD, as agreed?
Demurrage / despatch provisions
How do the applicable demurrage and despatch terms affect the calculation?
How We Deliver
From SOF to final laytime position.
Diabos brings together the contractual terms and the operational evidence required to prepare the Laytime Calculation.
- 01
Receive & check
Client instructions and supporting documents are received and checked against the applicable checklist.
- 02
Complete the document set
Missing information or documents are identified and requested before calculation begins.
- 03
Establish the contractual basis
Relevant Recap and Charter Party provisions are identified before calculation begins.
- 04
Prepare the calculation
Operational events are assessed against the applicable terms and the Laytime Calculation is prepared on the agreed CP basis.
- 05
Quality check
The completed LTC undergoes a separate, detailed quality review and corrections are made where required.
- 06
Submit
The final calculation is sent to the client along with the relevant supporting documents.
- 07
Clarify & amend
Where the client raises questions or requests amendments, the calculation is reviewed and updated accordingly.
What the final summary shows
Visibility into the basis of the calculation, not just the result.
- Vessel, voyage, charterer and CP
- Calculation basis and demurrage rate
- Laycan
- Load port: NOR accepted, laytime commenced, laytime ceased, time exclusions
- Discharge port: NOR accepted, laytime commenced, laytime ceased, time exclusions
Quality check before submission
Calculate. Check. Correct. Submit.
- The completed Laytime Calculation is sent for a separate quality check.
- The QC review examines the LTC and makes corrections where required before the final calculation is submitted to the client.
- This creates a defined separation between preparation and quality review.
Conciliation & clarification
When the numbers are questioned, go back to the terms and the evidence.
Client comments or clarification requests can require the calculation to be reviewed. Diabos addresses amendments or clarifications based on the applicable contractual terms and supporting documentation, then sends the revised calculation to the client for approval. The objective is not simply to produce a number; it is to provide a calculation that can be understood, reviewed and supported.
- Document completeness check
- Dry bulk and tanker documentation workflows
- Charter Party and Recap term review
- Laytime calculation
- NOR and time-event assessment
- Time-exclusion review
- Demurrage-related calculation basis
- Quality-checked final LTC
- Supporting documentation
- Clarification and amendment handling
- Confidential record maintenance
- Traceable records held until settlement
Turnaround
Normal turnaround is targeted at 2 working days, with urgent requests targeted for submission within 24 hours, subject to complete information and documentation.
Built For
The fixture desk and the post-fixture desk.
Pre-fixture contract accuracy and post-fixture time accuracy, handled by the same team.
Shipowners
Ensure agreed commercial terms are accurately reflected before execution, and establish a documented laytime position from the contractual terms and operational evidence.
Operators
Reduce the manual effort involved in checking detailed Charter Party documentation across multiple active fixtures, and in collecting and processing voyage documentation.
Charterers
Verify that the Working CP reflects the agreed fixture terms, and review laytime exposure against the agreed Charter Party provisions and recorded events.
Shipbrokers
Receive clear amendment points and prompt confirmation when the Working CP is ready to proceed, with supporting documentation for post-fixture requirements.
Because ‘almost correct’ is not correct enough. Start with the right documents, apply the agreed terms to the recorded events, and check the calculation before it reaches the client.
FAQs
Charter Party and laytime, answered.
The questions owners, operators, charterers and brokers ask us most often before they start.
What documents are required to initiate the Charter Party service?
The core documents are the Working CP, the Proforma CP and the Fixture Recap, along with additional specifications such as the Vessel Description, BIMCO riders or bank details where applicable.
What does Diabos compare during the CP audit process?
The Working CP is checked against the Recap to confirm that all agreed fixture terms are correctly incorporated. It is then compared with the Proforma CP, allowing for the agreed Recap terms.
What happens if discrepancies or errors are found?
Diabos identifies the exact discrepancies and provides clear, point-by-point amendment instructions before the CP proceeds to signing.
Does Diabos support the signing and execution process?
Yes. Diabos follows up with shipbrokers until the Charter Party is fully executed by both Owners and Charterers, and maintains the signed document for record purposes.
What documents are required for a Laytime Calculation?
The documentation depends on the vessel and calculation type. Dry bulk calculations generally require the Recap, Charter Party, fixture note where applicable, NOR, SOF and Bills of Lading. Tanker calculations can require a substantially broader set of operational and cargo documents.
What does Diabos check before calculating laytime?
Diabos checks that the required information is available, and reviews the relevant contractual provisions governing NOR acceptance, laytime commencement, cessation, exclusions and calculation basis.
Is every calculation quality checked?
Yes. The SOP specifies a separate quality-check stage before the final LTC is submitted to the client.
Can the calculation be amended?
Yes. Clarifications or amendments requested by the client are reviewed, and the amended calculation is sent back for client approval.
Does Diabos maintain the calculation records?
Yes. LTC documents and calculations are maintained on the Diabos server as private and confidential records for future reference until settlement.
Who are these services for?
Charter Party auditing and drafting is designed for Shipowners, Operators, Charterers and Shipbrokers. The Laytime and Conciliation service is designed for Shipowners, Operators and Charterers.
Question not covered here? Our team will answer it against your own fixtures and trade.
Talk to our Maritime Experts: info@diabos.biz
